A metal building sits only as square as the pad and slab under it. We lay the building out on your ground, build the pad, get the slab formed and poured to the building's drawings, and stand the frame and sheeting. With one crew on it from dirt to roof, there's no last guy to blame when the anchor bolts don't line up. Priced on site.
What a metal building job covers

The frame is steel columns and rafters, tied together with purlins on the roof and girts on the walls, then skinned in ribbed steel panels. It bolts down to a concrete slab through anchor bolts set in the pour. Most buildings ship as a package from a building supplier: framing, sheeting, trim, doors, fasteners, and the drawings that go with them.
The package leaves out the ground, the slab, and the crew to stand it up. That's our part. We walk the site with you, set the corners, build the pad, get the slab formed and poured with the anchor bolts where the drawings put them, and erect the building.
One crew on the whole job pays off at the handoffs. The pad has to drain, the slab has to be square and level, and the bolts have to match the frame. When the same crew owns all three, those handoffs get planned instead of argued over.
Where a metal building fits
On acreage, the usual building is a shop or equipment barn: somewhere for the tractor, the trailer, the truck, and the tools, with room to work out of the weather. Others go up as hay barns, horse barns, covered parking, or a building for a small business run off the property. For barns, loafing sheds, and covers, see shops, barns, and covers. Planning to live in it? See barndominium shells.
Where the building sits changes the paperwork, so we sort that out first.
Inside the Weatherford city limits
The City of Weatherford requires a permit for accessory structures over 200 square feet. That covers nearly every shop or barn. Setbacks, height, and the other rules come from the city, so check with them before you buy a building. Other towns set their own rules, so ask the city where the lot sits.
On acreage in unincorporated Parker County
Unincorporated Parker County doesn't issue building permits. It does regulate septic systems and any development in a mapped floodplain. If the building sits near a creek or a low spot, check the floodplain map before we set corners. Outside Parker County, check with that county.
Choices to make before you order
Size it to what goes inside, not to a brochure. 30x40 and 40x60 show up on plenty of shop brochures, and both work on a lot of places. But a gooseneck and a tractor with a loader need a different door and eave height than a bass boat and a workbench. Tell us what you'll park and do in there, and we'll help you plan the layout and size.
Clear span comes next. Most shop-size buildings span more than 24 feet with no post in the middle. Longer spans call for manufacturer-designed roof framing. Your building supplier provides the drawings, and we build to them.
- Width, length, and eave height. Eave height sets your tallest door. Measure the tallest thing you'll drive in, then add room.
- Doors. Roll-up doors, framed openings, and walk doors. Put them where you really drive in, and off the weather side if you can.
- Lean-tos. One on one or both sides gives covered parking or hay storage for less than a wider building.
- Insulation and liner. Worth it on a shop you'll work in. Less so on a hay barn.
- Where it sits. High enough to drain, close enough for a short drive, and far enough from trees and fence lines to work around.
What goes into it

Your building supplier ships the package: frame, purlins and girts, wall and roof panels, trim, doors, and fasteners. Smaller buildings and covers run tube-steel frames. Larger shops run welded I-beam frames. Panel gauge, profile, and color get set when you order. Ask your supplier for the manufacturer's stamped drawings for the building you pick. The slab gets formed and poured, and the frame goes up, to those drawings.
Most problems start at the slab. Vendor guidance from AA Metal Buildings calls for at least 4 inches of concrete for a garage or workshop, 5 to 6 inches where tractors, lifts, or equipment will sit, and 3,500 to 4,000 psi concrete. The same guidance says to slope the ground about 5% away from the slab and set anchor bolts within 1/16 inch of the building plan. Your building's drawings and the site set the final numbers.
Under the slab is the pad, and the pad is dirt work. Parts of the county have clay subsoils, so the pad gets built up and drained, not just scraped flat. See dirt work and building pads for how we build one.
How we build it

It starts with a walk. We look at where water runs, where the drive comes in, and what's underground or overhead. Then we lay the building out and set corners with you standing there, so you see it on the ground before any dirt moves.
- Pad. Strip topsoil and roots, haul in fill, and build the pad up in layers, packed as we go and shaped to shed water. Read site prep before a shop slab for the long version.
- Forms and anchor bolts. Forms go square to the layout. Anchor bolts hang from templates so they land where the drawings put them.
- Pour. The slab is poured, finished, and cured to the building's drawings before the frame goes up. AA Metal Buildings advises 28 days before full loading.
- Frame. Stand the columns and rafters, bolt in purlins and girts, and square the frame.
- Sheeting and trim. Roof and wall panels, trim, doors, and closures.
- Walk-through. We walk it with you, open every door, and clean up the site.
Tie-ins: pad, drive, fence, and gates
The last screw doesn't finish the job. You need a way in during a wet spring, somewhere for roof water to go, and usually a fence or gate around it. We do fence and land work on the same place, so those get planned with the building, not after it.
The drive and the apron at the big door come first. A gravel drive with a culvert where it crosses a ditch keeps trucks and trailers out of the mud. A lot of water comes off the eaves, so the pad slopes away and the low side gets somewhere to drain.
If the building sits in a pasture or a yard with stock, we can fence around it and hang a gate wide enough for the tractor. Pipe fence and pipe gates match a ranch entry. See pipe fence.
Adding on, repairs, and changes
Buildings grow. A lean-to off one side for parking or hay, or a cover off the end for a trailer, is a common way to add room. If someone else put the building up, tell us what you need and we'll say whether it fits. Any add-on starts with a look at the existing frame. A lean-to ties into the main frame, so the supplier's drawings for that building, or new drawings for the add-on, set how it attaches.
Storm damage, bent trim and panels, and doors that won't close right are worth asking about too. Some of that is a quick fix. Some of it, like a frame that moved because the slab or pad moved, needs a closer look before anyone promises anything. Send photos and we'll say whether it fits.
Questions about metal buildings
Do you build metal buildings, or just put up kits?
Both, depending on what you mean. Most metal buildings come as a package from a building supplier. We handle the rest: lay it out, build the pad, get the slab formed and poured to the building's drawings, and erect the frame and sheeting. Already bought one? Tell us what you have and we'll say whether it fits. If not, we can help plan the size and doors before you order.
How much does a 30x40 or 40x60 shop cost?
It's priced on site. The building package is only one part of the total. The pad, slab, drive, doors, and how much dirt has to move can swing the number a lot, and no two sites are the same. Send a few photos through the quote form or call or text 254-716-5760, and we'll come look.
Do I need a permit for a shop near Weatherford?
Inside the Weatherford city limits, yes. The city requires a permit for accessory structures over 200 square feet. Other towns set their own rules.
Unincorporated Parker County doesn't issue building permits, but it does regulate septic systems and development in mapped floodplains. If the building is near a creek or low ground, check before we set corners.
Who provides the building drawings?
Your building supplier. Ask for the manufacturer's stamped drawings for the building you order. Longer clear spans call for manufacturer-designed roof framing. We set the anchor bolts and erect the frame to those drawings.
How thick should the slab be?
Vendor guidance from AA Metal Buildings says at least 4 inches for a garage or workshop and 5 to 6 inches where tractors, lifts, or heavy equipment will sit, with 3,500 to 4,000 psi concrete. Your building's drawings and what you'll park on it set the final number.
Do you do the dirt work too?
Yes. The pad, the drive, and the drainage around the building are all part of the job. See dirt work and building pads.
Can you add a lean-to to the building I already have?
Ask us. Tell us about the building and what you need, and we'll say whether it fits. A lean-to ties into the existing frame, so the original supplier's drawings, or new drawings for the add-on, decide how it attaches.
How far do you travel for a building?
We're based in Weatherford, in Parker County. Buildings are listed for Weatherford, Aledo, Hudson Oaks, Willow Park, Granbury, Lipan, Mineral Wells, and Stephenville, in Parker, Hood, Palo Pinto, and Erath counties. Ask about other towns.
Where we build it
Metal buildings is on the list for these towns. Not on the list? Ask us.
Guides
Sources
- City of Weatherford, residential permits (accessory structures over 200 sq ft)
- Parker County permitting (no building permits; septic and floodplain regulated)
- Texas Occupations Code §1001.056 (exempt buildings; roof members on spans over 24 ft)
- AA Metal Buildings, concrete slab practice for metal buildings (vendor guidance)
- USDA Official Soil Series Description, Windthorst series (Parker County type location)